Understand the overlapping metal pieces at roof-to-wall joints, the role of kick-out flashing, and what should appear in the scope.

A dormer, chimney or taller wall creates a roof transition worth discussing before work starts. Ask for a roof overview that identifies every wall intersection, not just the most visible one.
Understand the detail
Step flashing uses individual bent metal pieces interwoven with shingle courses. The wall drainage layer must direct water onto the flashing. At the lower end, kick-out flashing diverts runoff away from the wall. A surface bead of sealant is not the same assembly.

Notice how each flashing piece overlaps the next and is integrated with a shingle course. This is the Duration-specific detail from Owens Corning; the wall drainage layer and lower kick-out also need proper detailing. Source: Owens Corning, Figure 7. View original detail.
At a glance
| Part | What to ask |
|---|---|
| Step pieces | Will damaged or unsuitable pieces be replaced? |
| Wall connection | How will the wall covering and drainage layer be handled? |
| Bottom transition | Where does water leave the roof-wall joint? |
| Finish work | Is siding, masonry or paint work included? |
Three steps for a clearer roof inspection
Map the intersections. Include dormers, sidewalls and chimney sides in the discussion.
Confirm access. Ask whether siding or other finishes must be removed to do the work.
Request progress photos. The important overlaps may be concealed when the wall finish is restored.
Can you judge flashing from the finished roof photo?
Only partly. Ask for installation-stage photographs and a written explanation of the wall connection. A neat-looking outer trim piece does not reveal every layer behind it.
Explore the connected details
Read the related roofing guide
See the roof shown in this guide
The cover is a completed-roof example from our project library. It is not proof of a particular shingle brand or of concealed installation details.
Sources and further learning
PNNL: Step and kick-out flashing
Owens Corning Contractor Academy: technical training topics
Prepared by Barnes N’ Roofs, serving the Austin and San Antonio metro areas from New Braunfels. Technical review: September 22, 2026. Installation must follow the selected product instructions and applicable local requirements.